THE MODEL CALCULATION HYDROGRAPH OF SPRING HIGH WATER ON SMALL RIVER, FLOWING DOWN WITH VASYUGAN MARSH.
In work are presented results to approbations to mathematical model calculation hydrograph of spring high water on timber and waterlogging catchments on method D.A. Burakov. Their are offered its modifications, taking into account particularities of the processes of landscape, running on surfaces of catchment and in its of streamming network. On example 6 small rivers are shown capacity to work this model and is determined borders to its applicability.
Keywords: waterlogging catchment, afforesttation, hydrograph of spring high water, water yield, quality of the forecast, водность year, volume of the high water, layer of the sewer, micro landscape , reach travel curve, optimization, water balance
References:
1. The Marsh systems West Siberia and their importance /О.Л. Liss, L.I. Abramova, N.A. Avetov, L.I. Inisheva and others Tula: Griph , 2001.
2. Burakov D.A. The Curves добегания and calculation hydrograph of high waters. Tomsk: TGU, 1978.
3. The Popov E. G. Hydrological forecasts. Moskow.: Gidrometeoizdat, 1979.
4. Kovzeli A.G. The Experience of the designing hydrograph of spring high water of the sewer for small catchment // Works GGI, 31 (85), Leningrad, 1951.
5. Rozenbrok X., Story S. Calculational methods for chemical ingineers. Moskow, Mir, 1968.
Issue: 3, 2009
Rubric: Hydrology and Melioration of Peat Lands
Pages: 137 — 142
Downloads: 1071